userMchandler6
rev 11 launch control boost issues (maybe throttle cut due to mph lc limiter release) and misfire cylinder 3 fault in RAL engagement |
12/04/2024
|
|
12/03/2024
|
|
12/03/2024
|
rev11 ecm rev3dsg
Increased peak load timing to 4dg
Launch Ctrl boost from 1 to 4psi
Pulled back lc timing and RAL timing
Adjusted burble duration and timing |
12/03/2024
|
1711 launch log
|
12/01/2024
|